After a mold job has been completed, what should be conducted before the containment is demolished?

  1. Site Inspection

  2. Post-Remediation Verification (PRV)

  3. Air Quality Testing

  4. Final Clean Up

The correct answer is: Post-Remediation Verification (PRV)

Post-Remediation Verification (PRV) is a crucial step that ensures the remediation process was effective before the containment is demolished. This step involves conducting a thorough assessment of the treated area to confirm that all mold has been removed and that the environment is safe for reoccupation. During the PRV, professionals will typically carry out air quality testing and visual inspections to determine if any mold spores remain in the air or on surfaces. Successful PRV results indicate that the mold hazard has been adequately addressed and that it is appropriate to proceed with demolishing the containment measures put in place. The completion of a site inspection, air quality testing, or final clean up can be part of the overall remediation process, but these steps may not necessarily confirm the efficacy of the mold removal. PRV specifically focuses on verifying the results of the remediation, making it the essential step that validates the safety of the environment before moving forward.